TSE 8035PrimeJGAAPYear end 03-31

Company Observatory / Semiconductor production equipment

Tokyo Electron Limited

東京エレクトロン

Under observationSelection: Research ongoingMeaningful formation in Japan not yet confirmed

Capability we observeIntegrating multiple semiconductor-production processes into customer volume manufacturing

How are multiple semiconductor-production processes connected to customers' volume manufacturing? We track the capability, its formation, and its burdens across deposition, coat/develop, etch, cleaning, inspection, and joint development for scaling and 3D integration.

Last reviewed: 2026-11-19Editorial review target: 2026-12-0418 sourcesRev. 3
Observation premises and assessment definitionsUnder observation ≠ selection approval

The next review date is an editorial target, not a company announcement date or an automatic update. We record the content and date of completed reviews.

Initial baseline: 2026-10-07

Sources included: 18 (last checked 2026-11-19)

Comparison: two endpoints, FY ended March 2016 and FY ended March 2026

The two endpoints, the years ended March 2016 and March 2026, are compared only as evidence of capacity to maintain and renew the capability. Because the intervening decade includes changes in business mix and semiconductor cycles, we do not present the endpoints as a continuous growth rate.

How to read the badges
Evidence status
Confirmed, partially confirmed, unconfirmed, and counterevidence describe the evidence for each claim. Confidence describes certainty in that assessment.
Data notes
A proxy is not a direct measurement of the capability. Different series have differing accounting standards or scope and cannot be used for a simple growth comparison.
Observation judgment
Unclear means there is insufficient evidence to say the capability strengthened or weakened. It does not mean there was no change.

01

Capabilities we observe

The subject is not company performance, but the capability and whom it enables.

Enables something in the worldBeing renewed

Integrating multiple semiconductor-production processes into customer volume manufacturing

We observe the integration of deposition, coat/develop, etch, cleaning, inspection, and 3D-integration equipment and support into customer processes. Lithography scanners, chip design, and finished-chip manufacturing are outside the boundary.

Formation and contributions from Japan and overseas

Concrete example

Partially confirmedConfidence Medium

Reason for this assessment
imec identifies a concrete joint process, but this is not independent customer verification.

Unknowns
Tokyo Electron's incremental contribution and customer yield, defectivity, and production-cost outcomes.

What we check next
Check production results and contribution allocation in customer or independent research evidence.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes

Formation

Partially confirmedConfidence Medium

Reason for this assessment
Company history traces the origin and domestic production, while causality to the present capability is only partial.

Unknowns
The capability uniquely formed in Japan after technology transfer and when it formed.

What we check next
Build a timeline from patent, site, workforce, and product-generation evidence.

History

Contribution from Japan

Partially confirmedConfidence Medium

Reason for this assessment
Domestic sites are documented, but evidence for their added contribution remains issuer-led.

Unknowns
Specific contributions from Japanese research, skills, and suppliers to each equipment capability.

What we check next
Reconcile Japanese and overseas R&D, manufacturing-site, and supplier evidence.

History / Integrated Report 2026

Overseas and external contribution

Partially confirmedConfidence Medium

Reason for this assessment
Multiple imec records document collaboration, but each comes from a collaboration party.

Unknowns
Contribution shares among customers, overseas sites, and research institutes.

What we check next
Trace roles by collaboration and customer implementation.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Tokyo Electron to collaborate in imec-ASML joint High NA EUV research laboratory

Relationship with the world

UnconfirmedConfidence Low

Reason for this assessment
Supporting evidence is limited to collaboration-party imec; independent evidence establishes competition but does not support customer outcomes.

Unknowns
Yield, defectivity, uptime, and cost outcomes repeated across multiple customers.

What we check next
Verify independent customer-process data across multiple implementations.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Lam Research 2025 Annual Report

Inheritance and renewal

Partially confirmedConfidence Medium

Reason for this assessment
Research plans and lab opening were checked, but completed integration and volume outcomes naming TEL tools remain unverified.

Unknowns
Volume adoption, skills succession, and supply capacity for next-generation processes.

What we check next
Record when announced research reaches volume production and with what results.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Tokyo Electron to collaborate in imec-ASML joint High NA EUV research laboratory

Conditions for substitution

Partially confirmedConfidence Medium

Reason for this assessment
Competitors are documented, while process-level switching cost and duration comparisons are lacking.

Unknowns
Alternatives, requalification cost, switching time, and multisourcing by process.

What we check next
Compare process-level switching conditions using competitor, customer, and regulatory evidence.

Lam Research 2025 Annual Report / imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes

Indicators of the capability

  • Customer-process outcomes verified by independent evidenceNot disclosed
  • Volume-production milestones for next-generation processesProxy
  • Environmental burden of equipmentCompany-reported
  • Substitution and switching conditionsNot disclosed

These indicators track maintenance and renewal of the capability, separately from profit and share price.

02

Capability observations

At dated checkpoints, we record confirmed values, limitations, and the next check.

Initial observation

This initial observation sets baselines for joint research, next-generation research milestones, environmental burdens and switching conditions. It is not a change from a previous observation. Independent customer process outcomes and TEL-specific switching cost and time remain unverified.

Customer-process outcomes verified by independent evidence

Unconfirmed
Not verified

Observation basis: 2025 imec collaboration account (reviewed November 2026)

imec links joint EUV process work to production adoption, but is a collaboration party. This review did not verify customer yield, defectivity, or uptime comparisons attributable to TEL.

Limits of this value
A first baseline from a limited source review; it does not establish absent outcomes or universal nondisclosure.
What we check next
Seek customer production comparisons identifying TEL tools, processes, and contribution allocation.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes

Volume-production milestones for next-generation processes

Partially confirmed
Qualitatively confirmed

Observation basis: 2021 plan / 2024 High-NA lab / February 2026 research review

The 2021 TEL collaboration plan is followed by the 2024 joint High-NA lab opening and a 2026 research review. These sources do not verify customer volume adoption or production outcomes identifying TEL tools.

Limits of this value
The 2024/2026 sources do not name TEL. Lab opening and research demonstrations are distinct from volume outcomes; the 2021 plan is not completion evidence.
What we check next
Seek customer volume qualification naming TEL tools and production yield, throughput, and cost for High-NA, CFET, and 3D integration.

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Tokyo Electron to collaborate in imec-ASML joint High NA EUV research laboratory / Imec and ASML open joint High NA EUV Lithography Lab offering an early development platform to the leading-edge semiconductor ecosystem / The case for High NA EUV: unlocking the next era of chip manufacturing

Environmental burden of equipment

Partially confirmed
Qualitatively confirmed

Observation basis: FY ended March 2026 / FY ended March 2022 reference

The initial baseline is limited to issuer disclosures. For the year ended March 2026, the reported reduction in product-use CO2 per wafer was 11% against FY2022, down from 21% a year earlier. This intensity measure includes customer renewable-energy adoption. Own Scope 1 and 2 emissions (Scope 2 market-based) rose from 47 to 63 kt; these figures do not establish a decline in the overall equipment burden.

Limits of this value
Customer-fab measurements for electricity, water and chemicals, equipment-generation burdens, Tokyo Electron's incremental contribution and full life-cycle outcomes remain unverified. Scope 3 Category 11 emissions of 8,080 kt estimate ten years of use for equipment shipped in the reporting year; they are not annual measured customer-fab emissions. Historical values use corrected editions; FY2026 method changes also limit attributing differences solely to equipment performance.
What we check next
Track intensity and absolute figures using the same boundaries and corrected editions, separating customer use from own operations and targets from results.

Integrated Report 2026 / Sustainability Data 2026 - Environment / Corrections to environmental data in prior integrated and sustainability reports

Substitution and switching conditions

Unconfirmed
Not verified

Observation basis: Lam 2025 and 2026 Form 10-K context

Lam’s 2025/2026 10-Ks describe qualification and integration investment and continued selection for the same application and node while specifications are met. TEL-specific switching cost and duration remain unverified.

Limits of this value
Competitor context, not measured TEL switching barriers, exclusivity, or customer-specific cost and time.
What we check next
Check alternative tools, requalification cost, tuning, yield-stabilization time, and multisourcing by customer and process.

Lam Research 2025 Annual Report / Lam Research 2026 Annual Report on Form 10-K

03

Reach and surrounding context

Competitor account

Lam Research 2025 Annual Report

04

Economic base supporting the capability

We compare FY ended March 2016 and FY ended March 2026 as evidence of the capacity to maintain and renew the capability.

This compares two endpoints, not an annual time series.

Net sales

Company disclosure

Qualified comparison

FY ended March 2016JPY 663.9 billion
FY ended March 2026JPY 2,443.5 billion

Company-reported endpoints only. No CAGR is shown because the period contains changes in business mix and semiconductor cycles. The starting endpoint follows million-yen figures rounded to the nearest unit in the cited English annual report. Japanese issuer disclosures also show figures one million yen lower. The revenue-recognition standard was applied from FY2022; the endpoints do not represent a continuous growth rate. The latest examined earnings release is the October 30, 2026 interim report, separate from this annual comparison. The next company earnings release is scheduled for 2027-02-05 and is subject to change. December 4, 2026 is an internal review proposal.

Annual Report 2016 / FY2026 Consolidated Financial Results / Integrated Report 2026 / Summary of Consolidated Financial Results for the Second Quarter Ended September 30, 2026 / IR Calendar

Operating income

Company disclosure

Qualified comparison

FY ended March 2016JPY 116.8 billion
FY ended March 2026JPY 624.9 billion

Company-reported endpoints only. No CAGR is shown because the period contains changes in business mix and semiconductor cycles. The starting endpoint follows million-yen figures rounded to the nearest unit in the cited English annual report. Japanese issuer disclosures also show figures one million yen lower. The revenue-recognition standard was applied from FY2022; the endpoints do not represent a continuous growth rate. The latest examined earnings release is the October 30, 2026 interim report, separate from this annual comparison. The next company earnings release is scheduled for 2027-02-05 and is subject to change. December 4, 2026 is an internal review proposal.

Annual Report 2016 / FY2026 Consolidated Financial Results / Integrated Report 2026 / Summary of Consolidated Financial Results for the Second Quarter Ended September 30, 2026 / IR Calendar

Operating margin

Market Flow calculation

Qualified comparison

FY ended March 201617.6%
FY ended March 202625.6%

Market Flow calculation: operating income divided by net sales. Comparison is limited to the two endpoints.

Annual Report 2016 / FY2026 Consolidated Financial Results

05

Mechanisms that sustain the capability

Initial capability KPI values and their verification limits are recorded under Capability observations.

06

Conditions for revisiting the current account

These are conditions for reinvestigating the business hypothesis, not bearish signals for the share price.

Assessment horizon: annual and process-generation review

Current premise

Equipment and support spanning several processes produce Tokyo Electron-specific improvements in customer yield, defectivity, and uptime.

Evidence that would trigger reconsideration

We will revisit the account if repeatable improvements and switching conditions cannot be verified in independent customer evidence.

Current observation

An imec collaboration example is verified, but broad customer outcomes and Tokyo Electron's incremental contribution are not.

Observation KPIs
Customer-process outcomes verified by independent evidence · Substitution and switching conditions

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Lam Research 2025 Annual Report

Assessment horizon: each announced development milestone

Current premise

Joint work on High-NA EUV, CFET, and 3D integration advances into volume manufacturing.

Evidence that would trigger reconsideration

We will revisit renewal capability if research-tool integration does not translate into production yield, throughput, and cost.

Current observation

Research plans and the joint High-NA lab opening were checked, but later sources do not name Tokyo Electron or verify completion of its tool integration or customer volume outcomes. On November 12, the company announced a new Device Integration Strategy Unit and the reorganization of the Sustainable Technology Strategy and New Space C&F Core Technology R&D units within Corporate Innovation, effective December 1. The changes were not yet effective on November 19; implementation, skill transfer and customer volume-production results remain unconfirmed.

Observation KPIs
Volume-production milestones for next-generation processes

imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodes / Tokyo Electron to collaborate in imec-ASML joint High NA EUV research laboratory / Imec and ASML open joint High NA EUV Lithography Lab offering an early development platform to the leading-edge semiconductor ecosystem / The case for High NA EUV: unlocking the next era of chip manufacturing / 組織変更および人事異動に関するお知らせ(2026年11月12日) / Announcement on Organization Changes and Personnel Changes (November 12, 2026)

Assessment horizon: annual

Current premise

Equipment renewal can reduce electricity, water, chemicals, greenhouse gases, safety, and human-rights burdens alongside performance gains.

Evidence that would trigger reconsideration

We will revisit the assessment if absolute or use-phase burdens worsen with output and reduction results cannot be verified.

Current observation

The initial baseline is limited to issuer disclosures. For the year ended March 2026, the reported reduction in product-use CO2 per wafer was 11% against FY2022, down from 21% a year earlier. This intensity measure includes customer renewable-energy adoption. Own Scope 1 and 2 emissions (Scope 2 market-based) rose from 47 to 63 kt; these figures do not establish a decline in the overall equipment burden.

Observation KPIs
Environmental burden of equipment

Integrated Report 2026 / Sustainability Data 2026 - Environment / Corrections to environmental data in prior integrated and sustainability reports

07

Major events

2023-07-23RegulatoryMonitoring

Japan adds semiconductor-production equipment export controls

Confirmed facts
Japan placed 23 categories of advanced semiconductor-production equipment under export control from July 23, 2023.
Company response
The company must make supply decisions under applicable laws and export controls in each jurisdiction.
Remaining risk
National security, customer access, supply chains, and regional revenue remain exposed.

Addition of Export Control Items for Semiconductor Manufacturing Equipment

08

Primary sources and definitions

  1. HistoryTokyo Electron Limited · Company material · Accessed 2026-10-07
  2. Annual Report 2016Tokyo Electron Limited · Company material · Accessed 2026-11-08
  3. FY2026 Consolidated Financial ResultsTokyo Electron Limited · Company material · Accessed 2026-11-08
  4. Integrated Report 2026Tokyo Electron Limited · Company material · Accessed 2026-11-08
  5. imec and Tokyo Electron extend partnership to accelerate development for beyond-2nm nodesimec · Academic · Accessed 2026-11-08
  6. Tokyo Electron to collaborate in imec-ASML joint High NA EUV research laboratoryimec · Academic · Accessed 2026-11-08
  7. Lam Research 2025 Annual ReportLam Research Corporation / U.S. SEC · Competitor · Accessed 2026-11-08
  8. Addition of Export Control Items for Semiconductor Manufacturing EquipmentMinistry of Economy, Trade and Industry · Government · Accessed 2026-10-07
  9. Sustainability Data 2026 - EnvironmentTokyo Electron Limited · Company material · Accessed 2026-11-08
  10. Summary of Consolidated Financial Results for the Second Quarter Ended September 30, 2026Tokyo Electron Limited · Company material · Accessed 2026-11-08
  11. IR CalendarTokyo Electron Limited · Company material · Accessed 2026-11-08
  12. Imec and ASML open joint High NA EUV Lithography Lab offering an early development platform to the leading-edge semiconductor ecosystemimec · Academic · Accessed 2026-11-08
  13. The case for High NA EUV: unlocking the next era of chip manufacturingimec · Academic · Accessed 2026-11-08
  14. Lam Research 2026 Annual Report on Form 10-KLam Research Corporation / U.S. SEC · Competitor · Accessed 2026-11-08
  15. Corrections to environmental data in prior integrated and sustainability reportsTokyo Electron Limited · Company material · Accessed 2026-11-08
  16. Issuance of Tokyo Electron Integrated Report 2026Tokyo Electron Limited · Company material · Accessed 2026-11-08
  17. 組織変更および人事異動に関するお知らせ(2026年11月12日)Tokyo Electron Limited · Company material · Accessed 2026-11-19
  18. Announcement on Organization Changes and Personnel Changes (November 12, 2026)Tokyo Electron Limited · Company material · Accessed 2026-11-19

Correction history