TSE 4063PrimeJGAAPYear end 03-31

Company Observatory / Semiconductors and functional materials

Shin-Etsu Chemical Co., Ltd.

信越化学工業

Under observationSelection: Research ongoingJointly formed in Japan and overseas

Capability we observeSupporting semiconductors, infrastructure, and energy-saving equipment through material performance

We observe the capability to support the performance of semiconductors, social infrastructure, and energy-saving equipment through material purity, uniformity, and durability. Market share and the importance of materials in general are not treated as Shin-Etsu-specific value.

Last reviewed: 2026-11-08Editorial review target: 2026-12-0420 sourcesRev. 2
Observation premises and assessment definitionsUnder observation ≠ selection approval

The next review date is an editorial target, not a company announcement date or an automatic update. We record the content and date of completed reviews.

Initial baseline: 2026-10-12

Sources included: 20 (last checked 2026-11-08)

Comparison: two endpoints, FY ended March 2016 and FY ended March 2026

As economic support for maintaining and renewing this capability, we compare reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Net sales moved from ¥1,279.8 billion to ¥2,574.0 billion, operating profit from ¥208.5 billion to ¥635.2 billion, and operating cash flow from ¥281.6 billion to ¥712.7 billion.

How to read the badges
Evidence status
Confirmed, partially confirmed, unconfirmed, and counterevidence describe the evidence for each claim. Confidence describes certainty in that assessment.
Data notes
A proxy is not a direct measurement of the capability. Different series have differing accounting standards or scope and cannot be used for a simple growth comparison.
Observation judgment
Unclear means there is insufficient evidence to say the capability strengthened or weakened. It does not mean there was no change.

01

Capabilities we observe

The subject is not company performance, but the capability and whom it enables.

Enables something in the worldBeing renewed

Supporting semiconductors, infrastructure, and energy-saving equipment through material performance

We observe how crystal growth, purification, processing, quality control, and mass production formed in Japan and overseas deliver purity, uniformity, and durability to customer processes.

Formation and contributions from Japan and overseas

Concrete example

Partially confirmedConfidence Medium

Reason for this assessment
Product capability is documented, while customer outcomes are not independently quantified.

Unknowns
Customer-level incremental yield, defects, and avoided downtime.

What we check next
Add customer- and equipment-maker process outcomes.

Silicon Wafers

Formation

Partially confirmedConfidence Medium

Reason for this assessment
Japanese and overseas formation actors are documented, but contribution cannot be separated.

Unknowns
Contributions by technology, site, and customer.

What we check next
Trace domestic and overseas sites and qualification history.

Shin-Etsu Handotai Shirakawa Plant / Company History

Contribution from Japan

Partially confirmedConfidence Medium

Reason for this assessment
Domestic mass production is documented, while Japan-specific increment is partly confirmed.

Unknowns
Distinct contributions of domestic research, education, and partners.

What we check next
Compare domestic research, people, and supplier contribution with independent evidence.

Shin-Etsu Handotai Shirakawa Plant

Overseas and external contribution

Partially confirmedConfidence Medium

Reason for this assessment
Overseas formation is documented, while site- and customer-level contribution remains incomplete.

Unknowns
Contributions of overseas sites and customer requirements.

What we check next
Add evidence from overseas sites and customers.

Shin-Etsu Handotai Shirakawa Plant / Annual Report 2026

Relationship with the world

Partially confirmedConfidence Low

Reason for this assessment
The industrial role is documented, while company-specific outcomes remain unverified.

Unknowns
Company-specific benefits and burdens by application.

What we check next
Compare application outcomes with competing materials.

Semiconductor and Digital Industry Strategy / Silicon Wafers

Inheritance and renewal

Partially confirmedConfidence Low

Reason for this assessment
Renewal measures coexist with serious accidents and environmental and regulatory burdens.

Unknowns
Accident causes and remediation, emissions reduction, and order compliance.

What we check next
Track accident remediation, Scope 1 and Scope 2, and EPA-order performance annually.

Sustainability Report 2026 / 信越半導体㈱白河工場における事故について / 直江津工場における転落事故発生について

Conditions for substitution

Partially confirmedConfidence Medium

Reason for this assessment
Competitors are identifiable, while qualification-switch comparisons remain limited.

Unknowns
Qualification switching cost and time across competing and multi-sourced wafers.

What we check next
Compare qualification and switching conditions across competing wafers.

SEMI Supply Chain Comments / EPA Administrative Enforcement Dockets — Shintech Louisiana, LLC

Indicators of the capability

  • Customer-process yield and quality outcomesNot disclosed
  • Continuity of qualified-material supplyNot disclosed
  • Worker incidents and remediationCompany-reported
  • Scope 1 and Scope 2 emissionsCompany-reported
  • Regulatory response at PVC/VCM sitesCompany-reported

These indicators track maintenance and renewal of the capability, separately from profit and share price.

02

Capability observations

At dated checkpoints, we record confirmed values, limitations, and the next check.

Initial observation

This initial observation sets baselines for customer processes, actual supply, incidents and remediation, emissions and site-specific regulatory response. It is not a change from a prior observation. Recognition, construction completion and an order filing are not substituted for customer benefits, stable supply or completed remediation.

Customer-process yield and quality outcomes

Unconfirmed
Not verified

Observation basis: Company wafer specification / November 2025 TSMC customer recognition

The company wafer-manufacturing account and TSMC’s 2025 recognition for technology development and production support were checked. These are transaction-party accounts, not verified customer yield, defectivity or avoided-outage comparisons attributable to Shin-Etsu.

Limits of this value
Customer recognition is not proof of quantified process improvement. This does not establish absent outcomes or universal nondisclosure, and competitor materials and the customer’s own contribution remain unseparated.
What we check next
Seek customer comparisons identifying products, processes and sites, qualification and switching conditions, and allocation of contributions.

Silicon Wafers / TSMC 2025 Supply Chain Management Forum Presents Awards to Outstanding Suppliers

Continuity of qualified-material supply

Unconfirmed
Not verified

Observation basis: October 2026 investment table: completed sites and future plans

The October 27 issuer investment table distinguishes the completed JPY 83 billion Isesaki lithography-materials site, planned JPY 10 billion Naoetsu pharmaceutical-cellulose investment, and Shintech’s USD 3.4 billion feedstock project scheduled by end-2030. Actual shipments, customer qualification, on-time delivery and avoided supply disruptions remain unverified.

Limits of this value
These concern different products and sites, not wafer-only outcomes or completed regulatory remediation. Construction completion, investment amounts and plans are not stable-supply outcomes.
What we check next
Track completion and plans under the same legend, then seek qualification, operation and shipments, delivery performance, interruptions and recovery by site and product.

Consolidated Financial Results for the First Half Ended September 30, 2026

Worker incidents and remediation

Partially confirmed
Qualitatively confirmed

Observation basis: 2024-08-07 Shirakawa; 2026-04-09 Naoetsu; original disclosures rechecked 2026-11-08

The issuer reported oxygen deficiency affecting two agency workers at Shirakawa on August 7, 2024; one was unconscious and critical as of 10:00 on August 8. A contractor's subcontractor employee died following a fall during overhead-line work at Naoetsu on April 9, 2026.

Limits of this value
These original disclosures do not establish the final Shirakawa outcome or subsequent root-cause findings, corrective measures and completion. Rechecking an old disclosure does not establish current injury or investigation status, or group-wide safety performance.
What we check next
Check subsequent issuer or competent-authority disclosures for final outcomes, causes, corrective actions and completion.

信越半導体㈱白河工場における事故について / 直江津工場における転落事故発生について

Scope 1 and Scope 2 emissions

Partially confirmed
6,819 kt-CO2e

Observation basis: Issuer FY2025: Japan Apr 2025-Mar 2026 / overseas calendar 2025

Reported consolidated FY2025 Scope 1 and 2 emissions were 6.819 million t-CO2e, covering April 2025 to March 2026 in Japan and calendar 2025 overseas. The market-based/location-based Scope 2 distinction was not verified. Absolute emissions, production intensity, targets and avoided emissions during product use are tracked separately.

Limits of this value
An issuer-reported consolidated absolute amount, not wafer-only burdens or use-phase benefits. Domestic and overseas periods differ; the Scope 2 method and constant-scope/method changes remain unverified. The reported total is used without replacing it by a sum of rounded components.
What we check next
Check the next value using matched periods, boundaries and methods, separating absolute emissions, intensity, future targets and customer-use effects.

ESG Data / Sustainability Report 2026

Regulatory response at PVC/VCM sites

Partially confirmed
Qualitatively confirmed

Observation basis: LDEQ finalized 2026-03-16; EPA order signed/filed 2026-06-09; review 2026-11-08

The state index records the settlement as finalized on March 16, 2026. EPA's original consent order CAA-06-2026-3543 was signed and filed on June 9 and sets corrective actions and reporting for Addis Plant A and Plaquemine under CAA112(r) and 40 CFR68. The docket displays Active.

Limits of this value
Active is a docket status, not proof of incomplete remediation or continuing violations. The state settlement PDF could not be reverified, and the index summary conflicts with its BEPS column. Submissions, acceptance and completion findings, the relationship between the state and federal matters, and all-site compliance remain unverified.
What we check next
Check EPA completion documentation and acceptance or compliance determinations, and obtain the signed state agreement and evidence of cash/BEP performance.

Settlement Agreements 2025 — Shintech Louisiana, LLC / AI126578 / SA-AE-24-0076 / EPA Administrative Enforcement Dockets — Shintech Louisiana, LLC / Shintech Louisiana, LLC — Administrative Order on Consent, CAA-06-2026-3543

03

Reach and surrounding context

External context

Semiconductor and Digital Industry Strategy / Silicon Wafers

Company account

Shin-Etsu Handotai Shirakawa Plant / Company History

External context

信越半導体㈱白河工場における事故について / 直江津工場における転落事故発生について / ESG Data / EPA Administrative Enforcement Dockets — Shintech Louisiana, LLC

04

Economic base supporting the capability

We compare FY ended March 2016 and FY ended March 2026 as evidence of the capacity to maintain and renew the capability.

This compares two endpoints, not an annual time series.

Net sales

Company disclosure

Qualified comparison

FY ended March 2016JPY 1,279.8 billion
FY ended March 2026JPY 2,574 billion

These are reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Accounting policies and consolidation scope changed during the period; the values are not restated to a constant scope or policy basis. Standard FCF is calculated as operating cash flow less cash purchases of PPE and intangible assets. Displayed operating margins are Market Flow calculations; CAGR is not shown. The latest examined financial release is the October 27, 2026 interim report, separate from this annual comparison. The next company earnings announcement date was not verified in the reviewed IR calendar; the December 31 quarter end is not treated as an announcement date. December 4, 2026 is an internal review proposal.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記 / Consolidated Financial Results for the First Half Ended September 30, 2026 / IR Calendar

Operating profit

Company disclosure

Qualified comparison

FY ended March 2016JPY 208.5 billion
FY ended March 2026JPY 635.2 billion

These are reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Accounting policies and consolidation scope changed during the period; the values are not restated to a constant scope or policy basis. Standard FCF is calculated as operating cash flow less cash purchases of PPE and intangible assets. Displayed operating margins are Market Flow calculations; CAGR is not shown. The latest examined financial release is the October 27, 2026 interim report, separate from this annual comparison. The next company earnings announcement date was not verified in the reviewed IR calendar; the December 31 quarter end is not treated as an announcement date. December 4, 2026 is an internal review proposal.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記 / Consolidated Financial Results for the First Half Ended September 30, 2026 / IR Calendar

Operating margin

Market Flow calculation

Qualified comparison

FY ended March 201616.29%
FY ended March 202624.68%

These are reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Accounting policies and consolidation scope changed during the period; the values are not restated to a constant scope or policy basis. Standard FCF is calculated as operating cash flow less cash purchases of PPE and intangible assets. Displayed operating margins are Market Flow calculations; CAGR is not shown. The latest examined financial release is the October 27, 2026 interim report, separate from this annual comparison. The next company earnings announcement date was not verified in the reviewed IR calendar; the December 31 quarter end is not treated as an announcement date. December 4, 2026 is an internal review proposal.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記 / Consolidated Financial Results for the First Half Ended September 30, 2026 / IR Calendar

Operating cash flow

Company disclosure

Qualified comparison

FY ended March 2016JPY 281.6 billion
FY ended March 2026JPY 712.7 billion

These are reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Accounting policies and consolidation scope changed during the period; the values are not restated to a constant scope or policy basis. Standard FCF is calculated as operating cash flow less cash purchases of PPE and intangible assets. Displayed operating margins are Market Flow calculations; CAGR is not shown. The latest examined financial release is the October 27, 2026 interim report, separate from this annual comparison. The next company earnings announcement date was not verified in the reviewed IR calendar; the December 31 quarter end is not treated as an announcement date. December 4, 2026 is an internal review proposal.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記 / Consolidated Financial Results for the First Half Ended September 30, 2026 / IR Calendar

Standard FCF

Market Flow calculation

Qualified comparison

FY ended March 2016JPY 133.6 billion
FY ended March 2026JPY 356.7 billion

Market Flow calculates standard FCF as operating cash flow less cash purchases of property, plant, equipment, and intangibles. It is not a company-reported KPI. These are two reported endpoints, not a constant-policy or constant-scope series; CAGR is not shown.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記

Return on equity (ROE)

Company disclosure

Qualified comparison

FY ended March 20167.5%
FY ended March 202610.4%

These are reported consolidated Japanese-GAAP values for the years ended March 2016 and March 2026. Accounting policies and consolidation scope changed during the period; the values are not restated to a constant scope or policy basis. Standard FCF is calculated as operating cash flow less cash purchases of PPE and intangible assets. Displayed operating margins are Market Flow calculations; CAGR is not shown. The latest examined financial release is the October 27, 2026 interim report, separate from this annual comparison. The next company earnings announcement date was not verified in the reviewed IR calendar; the December 31 quarter end is not treated as an announcement date. December 4, 2026 is an internal review proposal.

Annual Report 2016 / Consolidated Financial Results for the Fiscal Year Ended March 31, 2026 / 2022年3月期 決算短信・会計方針変更注記 / Consolidated Financial Results for the First Half Ended September 30, 2026 / IR Calendar

05

Mechanisms that sustain the capability

Purity, uniformity, and process control

The system connects crystal growth, polishing, inspection, and repeat supply of customer-qualified materials. We test customer outcomes and continuity rather than share alone.

Observation KPIs
Customer-process yield and quality outcomes · Continuity of qualified-material supply

Silicon Wafers / Annual Report 2026

Initial capability KPI values and their verification limits are recorded under Capability observations.

06

Conditions for revisiting the current account

These are conditions for reinvestigating the business hypothesis, not bearish signals for the share price.

Assessment horizon: annual and qualification-cycle review

Current premise

Purity, uniformity, and durability create incremental gains in customer yield, stable operation, and product life.

Evidence that would trigger reconsideration

The explanation must be revised if competing wafers or multi-sourcing produce equivalent results and Shin-Etsu-specific increment cannot be established.

Current observation

Product specifications and supply-chain importance are documented, while customer yield, avoided downtime, and qualification-switching conditions remain unverified.

Observation KPIs
Customer-process yield and quality outcomes · Continuity of qualified-material supply

Silicon Wafers / SEMI Supply Chain Comments

Assessment horizon: quarterly and incident review

Current premise

Advanced mass production can be inherited while protecting employees, temporary workers, and contractors.

Evidence that would trigger reconsideration

Inheritance capacity must be revised if fatal or severe accidents recur and causes, remediation, and prevention outcomes remain unverified.

Current observation

Two workers suffered oxygen deficiency at Shirakawa in 2024. In 2026, a contractor's subcontractor died after a fall at Naoetsu. Causes and remediation require continuing review.

Observation KPIs
Worker incidents and remediation

信越半導体㈱白河工場における事故について / 直江津工場における転落事故発生について

Assessment horizon: annual and regulatory review

Current premise

The group can supply materials for energy-saving equipment while reducing its own emissions and PVC/VCM hazards and regulatory burden.

Evidence that would trigger reconsideration

The social-benefit explanation must be revised if Scope 1 and Scope 2 do not improve relative to production or PVC/VCM violations, incidents, or incomplete remediation persist.

Current observation

Reported consolidated FY2025 Scope 1 and 2 emissions were 6.819 million t-CO2e, covering April 2025 to March 2026 in Japan and calendar 2025 overseas. The market-based/location-based Scope 2 distinction was not verified. Absolute emissions, production intensity, targets and avoided emissions during product use are tracked separately. EPA-order performance and state-settlement terms and performance are checked separately.

Observation KPIs
Scope 1 and Scope 2 emissions · Regulatory response at PVC/VCM sites

ESG Data / EPA Administrative Enforcement Dockets — Shintech Louisiana, LLC / Sustainability Report 2026 / Shintech Louisiana, LLC — Administrative Order on Consent, CAA-06-2026-3543 / Settlement Agreements 2025 — Shintech Louisiana, LLC / AI126578 / SA-AE-24-0076

07

Major events

2024-08-07Monitoring

Oxygen-deficiency accident at Shirakawa

Confirmed facts
On August 7, 2024, two temporary-agency workers servicing production equipment were hospitalized in an oxygen-deficient state; one was unconscious and in critical condition when disclosed.
Company response
The company said it would cooperate with authorities, determine the cause, and prevent recurrence.
Remaining risk
The final human outcome, cause, and remediation of equipment, work, and rescue procedures require confirmation.

信越半導体㈱白河工場における事故について

2026-03-16RegulatoryMonitoring

Louisiana regulatory settlement concerning Shintech

Confirmed facts
The state regulator’s index records Shintech Louisiana settlement SA-AE-24-0076 as finalized on March 16, 2026. This is not a payment-completion or PDF-publication date.
Company response
The index cash column shows USD 33,458.65. Its USD 35,000 BEPS column conflicts with the summary stating no BEP is included. The signed PDF could not be reverified, so BEP terms and actual payment or performance are unverified.
Remaining risk
The unavailable signed PDF retains its prior access date. Confirm the agreed terms, remediation and cash/project performance, and the relationship to the EPA order. Missing verification does not establish incomplete remediation.

Settlement Agreements 2025 — Shintech Louisiana, LLC / AI126578 / SA-AE-24-0076 / Shintech Louisiana, LLC Settlement Agreement SA-AE-24-0076

2026-04-09Monitoring

Fatal fall at Naoetsu

Confirmed facts
On April 9, 2026, a subcontractor employee conducting elevated power-line work at the Naoetsu plant fell and died.
Company response
The company said it would cooperate fully with the investigation and work to prevent recurrence.
Remaining risk
Cause, remediation, contractor governance, and horizontal deployment to similar work remain under review.

直江津工場における転落事故発生について

2026-06-09RegulatoryMonitoring

EPA administrative order concerning Shintech Louisiana

Confirmed facts
Original EPA consent order CAA-06-2026-3543 was signed, effective and filed June 9, 2026. It concerns EPA allegations under CAA112(r) and 40 CFR68 at Addis Plant A and Plaquemine; the respondent neither admits nor denies the stated factual or legal determinations.
Company response
The order sets measures and reporting on mechanical integrity, inspection, audits, operating procedures, management of change and emergency response. Submission, acceptance and completion findings were not verified.
Remaining risk
Active is a docket status, not proof of continuing violations or incomplete remediation. The screen’s docket number has a typographical difference; the original controls. Individual deadlines are not combined by inference, and all-site compliance is not inferred.

EPA Administrative Enforcement Dockets — Shintech Louisiana, LLC / Shintech Louisiana, LLC — Administrative Order on Consent, CAA-06-2026-3543

08

Primary sources and definitions

  1. Annual Report 2016Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  2. Consolidated Financial Results for the Fiscal Year Ended March 31, 2026Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  3. Annual Report 2026Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  4. Silicon WafersShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  5. Shin-Etsu Handotai Shirakawa PlantShin-Etsu Handotai Co., Ltd. · Company material · Accessed 2026-10-12
  6. Company HistoryShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-10-12
  7. Semiconductor and Digital Industry StrategyMinistry of Economy, Trade and Industry · Government · Accessed 2026-10-12
  8. SEMI Supply Chain CommentsSEMI · Industry body · Accessed 2026-10-12
  9. Sustainability Report 2026Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  10. ESG DataShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  11. 信越半導体㈱白河工場における事故についてShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  12. 直江津工場における転落事故発生についてShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  13. Shintech Louisiana, LLC Settlement Agreement SA-AE-24-0076Louisiana Department of Environmental Quality · Regulator · Accessed 2026-10-12
  14. EPA Administrative Enforcement Dockets — Shintech Louisiana, LLCU.S. Environmental Protection Agency · Regulator · Accessed 2026-11-08
  15. TSMC 2025 Supply Chain Management Forum Presents Awards to Outstanding SuppliersTaiwan Semiconductor Manufacturing Company Limited · Customer · Accessed 2026-11-08
  16. Consolidated Financial Results for the First Half Ended September 30, 2026Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  17. Settlement Agreements 2025 — Shintech Louisiana, LLC / AI126578 / SA-AE-24-0076Louisiana Department of Environmental Quality · Regulator · Accessed 2026-11-08
  18. Shintech Louisiana, LLC — Administrative Order on Consent, CAA-06-2026-3543U.S. Environmental Protection Agency, Region 6 · Regulator · Accessed 2026-11-08
  19. 2022年3月期 決算短信・会計方針変更注記Shin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08
  20. IR CalendarShin-Etsu Chemical Co., Ltd. · Company material · Accessed 2026-11-08

Correction history