Company Observatory / GTCC power generation and long-term service

Mitsubishi Heavy Industries

三菱重工業

Under observationSelection: Research ongoingJointly formed in Japan and overseas

Capability we observeConnecting power-equipment delivery with long-term service

How can power equipment remain usable long after delivery? We focus on gas turbine combined-cycle (GTCC) delivery, construction and long-term service, following technology developed in Japan together with overseas customers, operators and power systems. The broader company-level infrastructure selection assessment remains research ongoing.

Last reviewed: 2026-11-06Editorial review target: 2026-12-0427 sourcesRev. 1
Observation premises and assessment definitionsUnder observation ≠ selection approval

The next review date is an editorial target, not a company announcement date or an automatic update. We record the content and date of completed reviews.

Initial baseline: 2026-11-06

Sources included: 27 (last checked 2026-11-06)

Comparison: two endpoints, FY ended March 2016 (JGAAP) and FY ended March 2026 (IFRS)

Consolidated March 2016 JGAAP results and March 2026 IFRS results are shown as non-comparable endpoints, with no CAGR, because accounting and continuing/discontinued scopes differ. GTCC-only revenue and after-sales ratios are recorded separately; group totals do not measure GTCC outcomes.

Different series are not compared as growth rates. See the notes for each indicator in 04 Economic base for accounting standards and scope differences.

How to read the badges
Evidence status
Confirmed, partially confirmed, unconfirmed, and counterevidence describe the evidence for each claim. Confidence describes certainty in that assessment.
Data notes
A proxy is not a direct measurement of the capability. Different series have differing accounting standards or scope and cannot be used for a simple growth comparison.
Observation judgment
Unclear means there is insufficient evidence to say the capability strengthened or weakened. It does not mean there was no change.

01

Capabilities we observe

The subject is not company performance, but the capability and whom it enables.

Supports the worldBeing renewed

Connecting power-equipment delivery with long-term service

The scope covers GTCC delivery, engineering, procurement and construction (EPC), long-term service and renewal. It examines part of the broader infrastructure hypothesis. Transport, space, defense and nuclear outcomes or safety do not represent this capability.

Formation and contributions from Japan and overseas

Concrete example

Partially confirmedConfidence Medium

Reason for this assessment
Contracts, completion and owner COD records align; long-term results and incremental attribution remain separate.

Unknowns
Unit-level outage causes under consistent definitions, incremental customer reliability/tariff effects and long-term LTSA performance.

What we check next
Check subsequent RATCH MD&A and original tables, fixing AF/EAF, unit/plant and quarterly/half-year scopes before examining outages.

Hin Kong GTCC EPC and 25-year turbine LTSA / Completion of 1,400 MW Hin Kong GTCC / Q1 2025 MD&A: Hin Kong COD and AF / Electricity Generation: 2024 availability and reliability / Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenance

Formation

Partially confirmedConfidence Medium

Reason for this assessment
Specific company milestones are verified, but formation history is mainly self-reported.

Unknowns
Technology transfer and current JAC contributions by co-developer, customer and supplier.

What we check next
Add customer and co-development records to connect milestones to current product lineage.

Gas turbine development history

Contribution from Japan

Partially confirmedConfidence Medium

Reason for this assessment
Domestic implementation and support arrangements are documented; national incremental contributions are unverified.

Unknowns
Roles and results of design, manufacturing, service and training in Japan and abroad.

What we check next
Add domestic customer, production and training results, separating arrangements from outcomes.

Gas turbine development history / Long Term Service Agreement for Power Plants / Gas/steam turbine field-service training

Overseas and external contribution

Partially confirmedConfidence Medium

Reason for this assessment
Owner and purchaser records identify roles, but both have economic interests.

Unknowns
Contributions and contract responsibilities across operator, fuel supply, grid, EPC and OEM.

What we check next
Update ownership/control, operator and EGAT records and LTSA responsibility allocation.

Q1 2025 MD&A: Hin Kong COD and AF / Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenance / Analyst Meeting Q2/2026 / Availability and Reliability of Electricity System

Relationship with the world

UnconfirmedConfidence Medium

Reason for this assessment
Independent IEA evidence covers general methane and power-system context, not MHI-specific net benefits.

Unknowns
Hin Kong actual emissions, upstream methane, local water/air/labor impacts and a comparative counterfactual.

What we check next
Add project emissions, fuel procurement, water, local complaints/remediation and third-party checks.

Completion of 1,400 MW Hin Kong GTCC / Water Management: 2025 plant water withdrawals / TCFD disclosure: progress and fuel-transition roadmap / Global Methane Tracker 2026: Understanding methane emissions / Integrating Solar and Wind: Executive summary

Inheritance and renewal

Partially confirmedConfidence Medium

Reason for this assessment
Arrangements and plans are documented; independent longitudinal parts and skills outcomes are unverified.

Unknowns
Skills retention/certification/turnover, parts lead times, repair rework and delivery of capacity plans.

What we check next
Check parts lead times, repairs, recovery, skills certification and actual capacity commissioning.

Long Term Service Agreement for Power Plants / Gas/steam turbine field-service training / 1H FY2026 Financial Results

Conditions for substitution

Partially confirmedConfidence Medium

Reason for this assessment
A competitor portfolio and system options are documented, without a matched project substitution comparison.

Unknowns
Alternative configurations meeting identical reliability needs, switching cost/time and fuel/emissions/water comparison.

What we check next
Use procurement and grid records to distinguish OEM alternatives from system-function substitution under matched conditions.

H-Class Gas Turbines / Integrating Solar and Wind: Executive summary / Availability and Reliability of Electricity System

Indicators of the capability

  • Commercial operation and availabilityCompany-reported
  • Long-term service and outagesCompany-reported
  • Parts, skills and renewalProxy
  • Emissions and local burdensProxy
  • Alternatives and system integrationProxy

These indicators track maintenance and renewal of the capability, separately from profit and share price.

02

Capability observations

At dated checkpoints, we record confirmed values, limitations, and the next check.

Initial observation

Initial observations for five GTCC-specific measures. December 4 is an internal review date, not the company next earnings date.

Commercial operation and availability

Partially confirmed
Qualitatively confirmed

Observation basis: 2024 Unit 1 / Q2 and 6M 2025-2026 HKP

Unit 1 entered commercial operation on March 1, 2024 and Unit 2 on January 1, 2025. RATCH reports HKP-wide AF of 88.05% for April-June 2026 and 93.97% for January-June. These are kept separate from 2024 unit-level EAF.

Limits of this value
Do not join annual Unit-1 EAF to HKP-wide AF. Presentation rounded EAF and MD&A AF are not verified as identical definitions. Q2/2026 table images remain unavailable; weighting and outage detail need checking.
What we check next
At the December 4 internal review, check subsequent RATCH disclosures, table images and AF/EAF definitions on consistent quarter/half-year and HKP scopes.

Completion of 1,400 MW Hin Kong GTCC / Electricity Generation: 2024 availability and reliability / Q1 2025 MD&A: Hin Kong COD and AF / Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenance / Analyst Meeting Q2/2026 / Availability and Reliability of Electricity System

Long-term service and outages

Partially confirmed
Qualitatively confirmed

Observation basis: 2020 contract / 2025-2026 planned maintenance

A 25-year LTSA is documented. RATCH half-year MD&A records planned CI Plus for Unit 1 on June 29-July 21, 2025 (23 days), and Unit 2 on April 1-21, 2026 (21 days). The Q2/2026 AF decline is presented alongside planned maintenance, without diagnosing a failure or assigning responsibility to MHI.

Limits of this value
Periods are owner-reported. Do not recalculate how much of the 23-day event falls into half-year AF. Guarantees, penalties, responsibility allocation and MHI-specific outage reduction remain unverified.
What we check next
At the December 4 internal review, investigate planned versus actual outages, restart, forced outages and LTSA responsibilities.

Hin Kong GTCC EPC and 25-year turbine LTSA / Long Term Service Agreement for Power Plants / Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenance

Parts, skills and renewal

Partially confirmed
Qualitatively confirmed

Observation basis: 2026-11-06 arrangements and FY2027 onward plans

Parts inventories, engineering support, monitoring and practical training are documented. The November 6 half-year materials describe FY2027 onward investment plans for GTCC capacity including hot parts. Plans are not achieved capacity or skills improvements; parts lead-time and inheritance outcomes remain unverified.

Limits of this value
Supplier descriptions document arrangements. Investment, training delivery and resulting competence, quality and lead-time improvements are separate stages.
What we check next
At the December 4 internal review, track parts, skills, capacity commissioning and service outcomes.

Gas/steam turbine field-service training / Long Term Service Agreement for Power Plants / 1H FY2026 Financial Results

Emissions and local burdens

Partially confirmed
Qualitatively confirmed

Observation basis: 2025 project water / FY2024 group emissions / 2026 methane context

The owner 2025 water table reports Hin Kong withdrawals of 9,895,251 m3, discharge of 2,245,883 m3 and consumption of 7,649,368 m3. Group Scope 3 and general IEA methane context were checked. Project actual emissions, upstream methane and local harm/remediation outcomes remain unverified.

Limits of this value
Water values are owner reports, not quantities of pollution, health damage or disputes. Group Scope 3 is not project annual emissions; gas use or hydrogen readiness is not low-emissions operation.
What we check next
At the December 4 internal review, seek project emissions, upstream fuel, water, air and community records.

Water Management: 2025 plant water withdrawals / TCFD disclosure: progress and fuel-transition roadmap / Global Methane Tracker 2026: Understanding methane emissions

Alternatives and system integration

Partially confirmed
Qualitatively confirmed

Observation basis: As checked 2026-11-06

GE Vernova HA supply and IEA integration measures spanning renewables, storage, grids and demand response are documented, alongside EGAT purchasing, dispatch and transmission roles. A matched Hin Kong substitution comparison remains unverified.

Limits of this value
Competitor disclosures are not independent comparisons. General system options do not establish matched project substitutability or cost superiority.
What we check next
At the December 4 internal review, seek alternatives matched to procurement and grid requirements.

H-Class Gas Turbines / Integrating Solar and Wind: Executive summary / Availability and Reliability of Electricity System

03

Reach and surrounding context

Company account

FY2025 Results Presentation, pp.6 and 31

04

Economic base supporting the capability

We compare FY ended March 2016 (JGAAP) and FY ended March 2026 (IFRS) as evidence of the capacity to maintain and renew the capability.

This compares two endpoints, not an annual time series.

Group sales/revenue

Company disclosure

Different series

FY ended March 2016 (JGAAP)JPY 4,046,810 million
Different series
FY ended March 2026 (IFRS)JPY 4,974,168 million

Reported consolidated annual endpoints. March 2016 is JGAAP; March 2026 is IFRS. IFRS was adopted from Q1 of the year ended March 2019, with transition on April 1, 2017. No IFRS restatement of March 2016 was verified. All three metrics are non-comparable and carry no CAGR. JGAAP operating profit is not linked to company-defined business profit. March 2026 sales and pretax profit exclude discontinued Logisnext operations; owners' profit includes continuing and discontinued operations. Japanese amounts are rounded to JPY 100 million.

Results, March 2016 (JGAAP), p.7 / Results, March 2026 (IFRS), pp.6 and 16 / IFRS adoption: Results, March 2019

Group profit before tax

Company disclosure

Different series

FY ended March 2016 (JGAAP)JPY 132,682 million
Different series
FY ended March 2026 (IFRS)JPY 474,694 million

Reported consolidated annual endpoints. March 2016 is JGAAP; March 2026 is IFRS. IFRS was adopted from Q1 of the year ended March 2019, with transition on April 1, 2017. No IFRS restatement of March 2016 was verified. All three metrics are non-comparable and carry no CAGR. JGAAP operating profit is not linked to company-defined business profit. March 2026 sales and pretax profit exclude discontinued Logisnext operations; owners' profit includes continuing and discontinued operations. Japanese amounts are rounded to JPY 100 million.

Results, March 2016 (JGAAP), p.7 / Results, March 2026 (IFRS), pp.6 and 16 / IFRS adoption: Results, March 2019

Group profit attributable to owners

Company disclosure

Different series

FY ended March 2016 (JGAAP)JPY 63,834 million
Different series
FY ended March 2026 (IFRS)JPY 332,129 million

Reported consolidated annual endpoints. March 2016 is JGAAP; March 2026 is IFRS. IFRS was adopted from Q1 of the year ended March 2019, with transition on April 1, 2017. No IFRS restatement of March 2016 was verified. All three metrics are non-comparable and carry no CAGR. JGAAP operating profit is not linked to company-defined business profit. March 2026 sales and pretax profit exclude discontinued Logisnext operations; owners' profit includes continuing and discontinued operations. Japanese amounts are rounded to JPY 100 million.

Results, March 2016 (JGAAP), p.7 / Results, March 2026 (IFRS), pp.6 and 16 / IFRS adoption: Results, March 2019

05

Mechanisms that sustain the capability

Initial capability KPI values and their verification limits are recorded under Capability observations.

06

Conditions for revisiting the current account

These are conditions for reinvestigating the business hypothesis, not bearish signals for the share price.

Assessment horizon: annual and field-study review

Current premise

Post-delivery service supports equipment availability for customers.

Evidence that would trigger reconsideration

Reassess when consistently defined availability, outage and repair records or customer evaluations no longer support the account.

Current observation

The latest verified HKP-wide AF is 88.05% for April-June 2026. Planned maintenance is recorded separately; unit EAF and utilization are not joined to this series.

Observation KPIs
Commercial operation and availability · Long-term service and outages

Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenance / Hin Kong GTCC EPC and 25-year turbine LTSA

Assessment horizon: annual and product-generation review

Current premise

Parts and skills can be maintained and renewed to sustain service.

Evidence that would trigger reconsideration

Revisit the premise when parts shortages, repair quality, succession or investment issues persist without improved customer outage results.

Current observation

Company accounts document parts, training and capacity plans; lead times, achieved skills and outage reductions remain unconfirmed.

Observation KPIs
Parts, skills and renewal

Long Term Service Agreement for Power Plants / Gas/steam turbine field-service training / 2026年度第2四半期決算説明資料, pp.11 and 23: GTCC revenue and sales AS ratio

Assessment horizon: annual and site-level review

Current premise

Power-system needs can be assessed together with local and environmental burdens.

Evidence that would trigger reconsideration

Revisit the account when fuel, water, emissions, local burdens or like-for-like alternatives change the balance of benefits.

Current observation

Customer water data are documented; project lifecycle emissions, remedies and equivalent-system comparisons remain unconfirmed.

Observation KPIs
Emissions and local burdens · Alternatives and system integration

Water Management: 2025 plant water withdrawals / Global Methane Tracker 2026: Understanding methane emissions / Integrating Solar and Wind: Executive summary

07

Major events

2026-11-06AccountingMonitoring

Warranty provision for IGCC projects outside the GTCC scope

Confirmed facts
On November 6, 2026 MHI disclosed a JPY 67.5 billion provision in its interim results for estimated future costs, including periodic replacement of some parts, at the Nakoso and Hirono coal-based IGCC plants. This is a group economic-base event, not GTCC operating evidence.
Company response
The company described measures for stable operation and included the provision in its revised group annual forecast. Forecasts are not actual results, and recognition of a provision is not completed cash payment.
Remaining risk
Remediation outcomes and final costs need further review. This disclosure does not establish GTCC failure or responsibility, or the occurrence or absence of accidents across the company.

IGCC warranty provision, November 6, 2026 / 2026年度第2四半期決算説明資料, pp.11 and 23: GTCC revenue and sales AS ratio / Forecast revision, November 6, 2026

08

Primary sources and definitions

  1. Hin Kong GTCC EPC and 25-year turbine LTSAMitsubishi Power · Company material · Accessed 2026-11-06
  2. Completion of 1,400 MW Hin Kong GTCCMitsubishi Power · Company material · Accessed 2026-11-06
  3. Q1 2025 MD&A: Hin Kong COD and AFRATCH Group · Customer · Accessed 2026-11-06
  4. Electricity Generation: 2024 availability and reliabilityRATCH Group · Customer · Accessed 2026-11-06
  5. Q2 and 6M 2026 MD&A: Hin Kong AF and planned maintenanceRATCH Group · Customer · Accessed 2026-11-06
  6. Analyst Meeting Q2/2026RATCH Group · Customer · Accessed 2026-11-06
  7. Availability and Reliability of Electricity SystemElectricity Generating Authority of Thailand · Customer · Accessed 2026-11-06
  8. Gas turbine development historyMitsubishi Power · Company material · Accessed 2026-11-06
  9. Long Term Service Agreement for Power PlantsMitsubishi Power · Company material · Accessed 2026-11-06
  10. Gas/steam turbine field-service trainingMitsubishi Power · Company material · Accessed 2026-11-06
  11. 1H FY2026 Financial ResultsMitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  12. Water Management: 2025 plant water withdrawalsRATCH Group · Customer · Accessed 2026-11-06
  13. TCFD disclosure: progress and fuel-transition roadmapMitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  14. Global Methane Tracker 2026: Understanding methane emissionsInternational Energy Agency · Government · Accessed 2026-11-06
  15. Integrating Solar and Wind: Executive summaryInternational Energy Agency · Government · Accessed 2026-11-06
  16. H-Class Gas TurbinesGE Vernova · Competitor · Accessed 2026-11-06
  17. Results, March 2016 (JGAAP), p.7三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  18. Results, March 2026 (IFRS), pp.6 and 16三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  19. IFRS adoption: Results, March 2019三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  20. Interim Results, September 2026 (IFRS)三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  21. 2026年度第2四半期決算説明資料, pp.11 and 23: GTCC revenue and sales AS ratio三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  22. FY2025 Results Presentation, pp.6 and 31三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  23. GTCC事業説明会(説明要旨付き), p.6: long-term service contracts三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  24. IRカレンダー: no subsequent earnings announcement date shown after November 6, 2026三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  25. 決算短信・決算説明会: November 6, 2026 second-quarter results published三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  26. Forecast revision, November 6, 2026三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06
  27. IGCC warranty provision, November 6, 2026三菱重工業 / Mitsubishi Heavy Industries · Company material · Accessed 2026-11-06